Project List
Project search
Next Page
Page 1 of 2 NumberPhaseDelivery Budget
Arizona Stadium, Branding & Graphics, Experience Room & Equip Procurement
Installation of branding and graphic signage to support enhanced fan experience and wayfinding, recruitment of elite athletes, and improved opportunities for marketing, media coverage, and program recognition. Project is being undertaken in concert with the North End Zone Expansion project and with the Construction Manager at Risk providing the design.
13-9169
Occupancy
Design/Build
$3,600,000
Arizona Stadium, Student Union Food Service Equipment
Kitchen and serving area equipment design, purchase, and installation for the development of the the Cafe, Concessions and Loge/Club to be located in the Arizona Stadium North End-Zone Expansion. The food services will be owned and operated by the Student Union and will support Arizona Stadium during events as well as student athletes and the campus community during non game days.
11-9071
Occupancy
CMR
$2,000,000
Arizona State Museum, Renovate Basket Collection Space
This is Phase 3 of the Arizona State Museum Basket Collection Space project which will reconfigure existing exhibit space in Room 102 to create the Arnold & Doris Roland Basketry Gallery. The Gallery project when completed will provide much needed public access, display, education and interpretive space for the Arizona State Museum's Basket Collection, recipient of the Save America's Treasures Award.
11-9073
Design
Job Order Contract
$875,100
Bioscience Research Laboratories
This project is to construct a new facility for collaborative translational research that will advance understanding of the molecular basis of human health, aging and disease. This building will provide laboratories, imaging facilities and a clinic to support interdisciplinary research in many health science disciplines.
12-9134
Design
CMR
$85,000,000
Bryant Bannister Tree-Ring Building
The Laboratory of Tree-Ring Research (LTRR) has been housed in the West Stadium for more than 70 years, with minimal improvements to their facilities. This project will provide new laboratories and offices to house the LTRR's diverse array of research programs, as well as public outreach and support spaces. The project is the first phase of a long-term effort to relocate the entire LTRR into contemporary facilities. Minor renovations of space at the Math East building is included in the project.
08-8826
Occupancy
CMR
$12,039,000
CALS Agricultural Centers, Development Plan
The College of Agriculture and Life Sciences (CALS) is involved in ongoing analysis of the University of Arizona Campus Agricultural Center to refine the long-range vision for the Center.
11-9030
Study
TBD
$46,000
Campus Enterprise GIS
Create a cross-departmental, state-of-the-art Enterprise Geographic Information System (GIS) for managing shared spatial data about the University of Arizona campus.
10-8983
Study
TBD
$60,000
College of Law, Career Development Offices Renovation
Reconfiguration, renovation, and expansion of the College of Law's Career Development Office suite made possible via donor funding.
14-9221
Occupancy
Job Order Contract
$525,000
Drama Addition Building, Rm 116, Lighting Controller Replacement
The College of Fine Arts is in need of replacing failing stage lighting in room 116 which is used as a studio theater providing public performance for theater majors as part of their curricular requirements. This project includes a new theatrical lighting control system and modifications to the existing power supply for the new controller.
14-9229
Occupancy
Job Order Contract
$16,400
ECE Lobby Renovation
Renovate the Main Lobby at the Electrical & Computer Engineering Building to provide a more contemprary identity for the Department.
13-9179
Occupancy
Job Order Contract
$58,500
Education,Worlds of Words Renovate 4th Flr Library
Renovation of approximately 5,800 sf of existing fourth floor space (formerly Education Library) into a library for the Colleges' International Collection of Children's and Adolescent Literature (World of Words). Spaces include collection, reading, special collection, art studio and classroom and support spaces. The project is funded by the College of Education.
12-9139
Occupancy
Job Order Contract
$896,100
Electrical & Computer Engineering, Room 556 Renovation
Renovation of Rm 556 to create a large mediated conference room
14-9228
Design
TBD
$0
Environment & Natural Resources Phase 2 (ENR2)
This new facility at 1064 E. Lowell St.(ENR2) east of the DeConcini ENRB1 furthers interdisciplinary research in earth, environmental, natural resources, math and related sciences. Included are faculty offices, conferencing, support spaces with related research/instructional dry laboratories and work space. A large classroom auditorium meets the critical need to teach an increasing number of students.
03-8526
Construction
CMR
$75,000,000
Fifth Street Bicycle and Pedestrian Improvements
This project will develop pedestrian, bicycle, and fire lane improvements to the 5th Street corridor between Euclid and Tyndall Avenues. The proposed bicycle route will connect with the new City of Tucson 5th Street Bicycle Boulevard west of Euclid Avenue.
13-9190
Design
Job Order Contract
$980,000
Forbes Building Lobby Renovation
Renovate the existing Main Lobby and Main Entrance in the Forbes Building for the College of Agriculture and Life Sciences.
14-9213
Design
Job Order Contract
$1,700,000
Health Science Education Building, Finish Shell Space
This Tenant Improvement project in the Health Sciences Education Building will include a regional Simulation Center, completion of a Lecture Hall, administrative space, a Presidential Suite and the possible inclusion of classroom/Learning Studio space. Projects 13-9182 (HSEB, Finish Shell Space), 13-9206 (HSEB Finish Shell Space UA), and 13-9207 (HSEB Finish Shell Space NAU) will be covered under this description.
13-9182
Occupancy
CMR
$17,900,000
Health Sciences Education Building
Addition of a new building, named the Health Sciences Education Building, on the Phoenix Biomedical Campus (PBC), 435 N. 5th Street, Phoenix 85004, is to include flexible classrooms and state-of-the-art educational facilities, such as, simulation laboratories, gross anatomy facilities, preclinical training, learning resource center, student services and faculty office administrative space.
09-8900
Occupancy
CMR
$135,998,801
Highland Commons, CAPS Remodeling
Remodel an area on the third floor of Highland Commons in the Counseling and Psych Services area.
14-9226
Construction
TBD
$75,000
Hillenbrand Softball Stadium Renovations
Based on the 2013 Feasibility Study and current donations, a Phase 1 project has been identified for Hillenbrand Softball Stadium. The project will include renovations and additions to the present 1313 GSF clubhouse, required electrical systems upgrades to support proposed stadium renovations, irrigation repairs and sod replacement at the ballfield. The addition to clubhouse will include a team lounge, locker room with restrooms and shower, training room and an equipment storage room. Additional SF to clubhouse to be finalized with the development of the cost estimate.
13-9187
Design
Job Order Contract
$1,526,000
HSEB - NAU Occupational Therapy Area Improvements
Project consists of the remodel of the existing occupational therapy rooms in the Health Science Education Building to accommodate new equipment that is being purchased by Northern Arizona University.
14-9227
Occupancy
Job Order Contract
$170,716
Kuiper Space Sciences, TEM Equipment Installation
Installation of a Scanning Electron Microscope in the Basement Room 15C located at the Kuiper Space Sciences building.
12-9159
Design
Job Order Contract
$205,000
Lowell-Stevens Football Facility (Az Stadium, North End Zone Expansion)
Construction of the new north end-zone facility at Arizona Stadium will provide upgraded premium seating and fan amenities, relocate and provide new facilities for the football program and provide new concourses cross connecting access to the east and west stadium seating sections.
09-8902
Occupancy
CMR
$72,300,000
Marvel Building, 3rd Floor Renovation
Constructing a new Laser Lab on the 3rd Floor of the Marvel Building.
14-9210
Occupancy
Job Order Contract
$500,000
McClelland Hall, McGuire Center, Classroom 113 Remodeling
Remodel classroom 113 in McClelland Hall for the McGuire Center.
14-9216
Construction
Job Order Contract
$325,000
McClelland Hall, Professional Development Center Addition
Infill two levels on the south side of the McClelland Hall courtyard to provide additional program space.
14-9232
Design
CMR
$4,985,000
McKale Memorial Center Improvements
The original approved $80 million project for the improvements at the McKale Memorial Center will be moving forward as phased projects. The first phase will be a $29.9 million project that consists of two parts. Project 14-9222 has been identified for equipment procurement and installation of the wood gym floor and arena seating. Project 13-9191 consists of aisle tread improvements, hand railing, additional ADA platforms, locker room improvements, a vertical circulation tower (stair and elevator), additional restrooms and concessions at the concourse level.
13-9191
Construction
CMR
$80,000,000
McKale Memorial Center Video Board Upgrades & Roof Truss Analysis
Conduct analysis and recertification of the McKale Roof Trusses in conjunction with the installation of the new center hung video board installed earlier this year.
14-9231
Design
TBD
$52,000
Modern Streetcar, Facilitate Campus Development / Improvements
PDC will work with the City of Tucson representatives and other campus participants in facilitating the construction of a 1.1-mile segment of the Modern Streetcar system extending through the University from Helen Street and Campbell Avenue continuing through the Warren Avenue underpass along Second Street to Park Avenue. System elements include installation of requisite tracks and lines, utility relocation, station construction and storm water mitigation.
12-9149
Occupancy
Design/Bid/Build
$200,000
Multiple Parking Garage Maintenance Repairs
Maintenance repairs at 5 parking garages - Tyndall Avenue, Main Gate, Park Avenue, 2nd Street, and Cherry Avenue.
14-9224
Construction
Job Order Contract
$770,000
North Campus Infrastructure
North Campus Infrastructure is a multi-stage, multi-element project which will expand the University's existing infrastructure including, but not limited to mechanical; electrical; telecommunications utility distribution systems; central plant heating, chilled water and potable water production; sewer and surface drainage to support the new Engineering Innovation Building, Bioscience Research Labs, and future campus growth.
12-9135
Design
CMR
$32,000,000
Page 1 of 2     
Next Page