AHSC Traffic Study
This study analyzed current traffic conditions and the potential impact of proposed growth within the Arizona Health Sciences Center area. The report provides a number of recommendations to effectively manage parking and circulation beyond the 10-year planning horizon.
|
12-9148
|
Study
|
TBD
|
$56,000
|
|
|
AHSC, Renovate Surgery Offices 4th & 5th Floors Phases 3, 4 & 5
Conversion of 8,530 sf of 4th flr lab & office space into offices for the Dept of Surgery Transplant, ENT & Plastic Surgery provides space for new researchers & faculty, & consolidate office & support for surgery programs. Renovation of the 1,480 sf 5th flr lecture hall upgrades teleconferencing capabilities & teaching venue to current standards. Phase 5 Renovation of the two lecture halls on the 2nd & 3rd flrs totaling 3,050 sf upgrades those teaching venues to current standards.
|
11-9051
|
Construction
|
Job Order Contract
|
$2,495,500
|
|
|
Arizona Cancer Center, IT Closet Upgrade
This project is to upgrade the IT Closets in the building and upgrade the infrastructure system within the building.
|
13-9198
|
Design
|
Job Order Contract
|
$165,000
|
|
|
Arizona Stadium, Branding & Graphics, Experience Room & Equip Procurement
Installation of branding and graphic signage to support enhanced fan experience and wayfinding, recruitment of elite athletes, and improved opportunties for marketing, media coverage, and program recognition. Project is being undertaken in concert with the North End Zone Exapansion project and with the Construction Manager at Risk providing the design.
|
13-9169
|
Construction
|
Design/Build
|
$3,600,000
|
|
|
Arizona Stadium, South End Zone Seating Expansion
Extension of the existing south end zone seats to replace bleachers (Red Zone) removed to install the new video board. Project also includes the restoration of the turf field for the 2012 season.
|
12-9130
|
Occupancy
|
CMR
|
$1,742,207
|
|
|
Arizona Stadium, Student Union Food Service Equipment
Kitchen and serving area equipment design, purchase, and installation for the development of the the Cafe, Concessions and Loge/Club to be located in the Arizona Stadium North End-Zone Expansion. The food services will be owned and operated by the Student Union and will support Arizona Stadium during events as well as student athletes and the campus community during non game days.
|
11-9071
|
Construction
|
CMR
|
$2,000,000
|
|
|
Arizona State Museum, Renovate Basket Collection Space
Create display and storage space for the Arizona State Museum's Basket Collection in Room 110 located in the north building. Upgrades will accommodate fragile and valuable collections in a secure, improved, visible storage facility. The project is based on Save America's Treasures Award and is a highest priority collection need for the museum.
|
11-9073
|
Construction
|
Job Order Contract
|
$525,100
|
|
|
Bear Down Gymnasium, Addition and Renovation
The Bear Down Gymnasium is a significant historic structure in the heart of the Campus that requires renovation and modernization. This project includes the adaptive re-purposing of the historic facility, as well as an addition to the south of the building.
|
12-9151
|
Design
|
Design/Build
|
$27,400,000
|
|
|
Biomedical Research Laboratory Renovation
Renovation of space at the Biomedical Research Laboratory, (Building 225) to facilitate the installation of MRI equipment for the Department of Radiology. Renovation of space to accommodate NMR equipment being relocated from Building 225 and Chemistry (Building 41) to a renovated suite in Biological Science West (Building 88).
|
12-9121
|
Construction
|
Job Order Contract
|
$1,330,610
|
|
|
Bioscience Research Laboratories
This project is to construct a new facility for collaborative translational research that will advance understanding of the molecular basis of human health, aging and disease. This building will provide laboratories, imaging facilities and a clinic to support interdisciplinary research in many health science disciplines.
|
12-9134
|
Design
|
CMR
|
$85,000,000
|
|
|
Bryant Bannister Tree-Ring Building
The Laboratory of Tree-Ring Research (LTRR) has been housed in the West Stadium for more than 70 years, with minimal improvements to their facilities. This project will provide new laboratories and offices to house the LTRR's diverse array of research programs, as well as public outreach and support spaces. The project is the first phase of a long-term effort to relocate the entire LTRR into contemporary facilities. Minor renovations of space at the Math East building is included in the project.
|
08-8826
|
Construction
|
CMR
|
$12,039,000
|
|
|
Campus Enterprise GIS
Create a cross-departmental, state-of-the-art Enterprise Geographic Information System (GIS) for managing shared spatial data about the University of Arizona campus.
|
10-8983
|
Study
|
TBD
|
$60,000
|
|
|
CAPLA East, Green Roof Conversion
Convert the existing CALA East building roof into a state-of-the-art Landscape Architecture Research laboratory space for green roofs in a desert environment.
|
08-8871
|
Design
|
TBD
|
$100,000
|
|
|
Centennial Hall, Renovation and Expansion
Constructed in 1936 and listed on the National Register of Historic Places, Centennial Hall is the University's largest performance venue. Last renovated in the late 1980's, the facility is in need of significant improvements to satisfy the requirements of contemporary productions. Improvements being considered are: new seating with improved sight lines, improved acoustics, enhanced and expanded lobby and patron areas, as well as improved support spaces.
|
08-8853
|
Design
|
CMR
|
$10,000,000
|
|
|
College of Fine Arts, Replace Holsclaw & Tornabene Lighting Controls
The existing Stage and hall lighting controllers are failing and are no longer in production. This project is to replace the two existing obsolete controllers.
|
13-9199
|
Construction
|
Job Order Contract
|
$215,000
|
|
|
Drake Building, Parking Lot Repairs And Expansion
Exterior renovations are required to repair and expand the existing parking facilities for the Drake Building in preparation to accomodate additional staff in support of the OSIRIS REx mission.
|
13-9196
|
Construction
|
Job Order Contract
|
$475,000
|
|
|
ECE Lobby Renovation
Renovate the Main Lobby at the Electrical & Computer Engineering Building to provide a more contemprary identity for the Department.
|
13-9179
|
Design
|
Job Order Contract
|
$50,000
|
|
|
Education,Worlds of Words Renovate 4th Flr Library
Renovation of approximately 5,800 sf of existing fourth floor space (formerly Education Library) into a library for the Colleges' International Collection of Children's and Adolescent Literature (World of Words). Spaces include collection, reading, special collection, art studio and classroom and support spaces. The project is funded by the College of Education.
|
12-9139
|
Design
|
Job Order Contract
|
$628,600
|
|
|
Engineering Innovation Building
A new interdisciplinary research-center focused building to provide critically needed infrastructure to support student recruiting and retention, to provide a foundation for growing research and innovative discovery programs, and to consolidate key research and support functions into a single location for increasing effectiveness and branding.
|
05-8623
|
Design
|
CMR
|
$63,000,000
|
|
|
Enviromental Research Laboratory-WEST Center
Relocation of the U of A's Environmental Research Laboratory (ERL) and certain College of Engineering water and energy related research programs to Pima County's ROMP Central Regional Laboratory Complex. The ROMP Complex is owned and operated by Pima County, a portion of which will be leased to the University.
|
12-9091
|
Design
|
TBD
|
$20,000
|
|
|
Environment & Natural Resources Phase 2 (ENR2)
This new facility at 1064 E. Lowell St.(ENR2) east of the DeConcini ENRB1 furthers interdisciplinary research in earth, environmental, natural resources, math and related sciences. Included are faculty offices, conferencing, support spaces with related research/instructional dry laboratories and work space. A large classroom auditorium meets the critical need to teach an increasing number of students.
|
03-8526
|
Design
|
CMR
|
$75,000,000
|
|
|
Fifth Street Bicycle and Pedestrian Improvements
Pedestrian, bicycle, and fire lane improvements to the 5th Street corridor between Euclid and Tyndall Avenues, including the redesign of the semi-circle parking lot at Tyndall Avenue. The bicycle improvements will connect with the proposed City 5th Street Bicycle Boulevard west of Euclid Avenue. Current funding is for design.
|
13-9190
|
Design
|
Job Order Contract
|
$55,000
|
|
|
Health Education & Advanced Technologies Building
Located at the Arizona Health Sciences Center, this new facility is a multi-disciplinary, inter-professional education and simulated practice building fostering trans-disciplinary collaborations and serving as a unique place for interactions between multidisciplinary teams of health professionals, students and faculty. in medicine, nursing, pharmacy and public health. In addition to flexible large,medium and small group/team learning areas the facility includes a state-of-the-art clinical skills and simulations center for a broad spectrum of instruction and applications.
|
13-9193
|
Design
|
CMR
|
$111,000,000
|
|
|
Health Sciences Education Building
Addition of a new building, named the Health Sciences Education Building, on the Phoenix Biomedical Campus (PBC), 435 N. 5th Street, Phoenix 85004, is to include flexible classrooms and state-of-the-art educational facilities, such as, simulation laboratories, gross anatomy facilities, preclinical training, learning resource center, student services and faculty office administrative space.
|
09-8900
|
Occupancy
|
CMR
|
$135,998,801
|
|
|
Hillenbrand Softball Stadium Renovations Study
ICA has identified several possible renovation projects for improvements around the stadium to continue the program excellence that has been established. The proposed projects include enclosing and additions to the batting cages, team room addition with locker room, training room, lounge/meeting room with vision and video areas, possible development of space below outfield bleachers, improved press box and stadium entrance, additional restrooms and concession area along the first base line or right field area, improved ticket area, dugout improvements including a restroom in each, possible shade cover at grandstands and a new pole less net system behind homeplate.
|
13-9187
|
Study
|
Job Order Contract
|
$26,000
|
|
|
Jimenez Field, Sand Volleyball Court Renovation Study
ICA would like to locate four sand volleyball courts at the north end of Jimenez Field for women's doubles NCAA sand volleyball team match play. A new main entry to the field along with grandstands for spectators, concession area, restrooms, team room will be included in the scope of the project.
|
13-9189
|
Study
|
Job Order Contract
|
$15,000
|
|
|
Lowell-Stevens Football Facility (Az Stadium, North End Zone Expansion)
Construction of the new north end-zone facility at Arizona Stadium will provide upgraded premium seating and fan amenities, relocate and provide new facilities for the football program and provide new concourses cross connecting access to the east and west stadium seating sections.
|
09-8902
|
Construction
|
CMR
|
$72,300,000
|
|
|
Main Library, Starbucks
This project is to remodel the existing Book Ends Cafe into a new Starbucks. The remodel will include an 1160 square feet retail sales space with a 730 square feet seating area. This project will also isolate the Starbucks from the adjacent spaces which share a common wall and air conditioning system.
|
13-9170
|
Construction
|
Job Order Contract
|
$800,000
|
|
|
Maricopa County Forensic Science Center Restoration
Lab space at the Maricopa County Forensic Science Center was adapted for use by the College of Medicine-Phoenix Gross Anatomy class until the Health Science Education Building was completed. The space is to be restored to its previous condition at the end of the lease.
|
12-9152
|
Occupancy
|
CMR
|
$216,000
|
|
|
McKale Memorial Center Improvements
Built in 1973, McKale Memorial Center is approaching 40 years of continuous heavy use. It is the largest in-door public assembly building on campus and provides seating for 14,650 spectators. The proposed 322,789 gross square foot (GSF) Mckale Memorial Center improvements project will construct new concourses to improve access to all arena seating and add restrooms and concession spaces to improve the fan experience. New spaces to be constructed along with the release of existing space from the re-location of the football program to North Stadium addition will allow the reconfiguration, renovation and expansion of the administrative and athletic programs that will remain in the McKale Memorial Center.
|
13-9191
|
Design
|
CMR
|
$80,000,000
|
| Page 1 of 2 | | | | | |