This project resurfaced the 69, 616 square foot Bear Down field with a new layer of 2.5" artificial turf. The existing field perimeter was trimmed back and re-leveled with sand. New fabric with markings matching the existing markings were installed over the old fabric.
Projected Ultimate Budget
Construction Project Manager
December 2022 - January 2023